Product Details
Brand Name: Danfoss
Model Number: 136L9774
Payment & Shipping Terms
Complete Type Code: |
FC-302N355T5E54H2XGC3XXSXXXXALBXCXXXXDX |
Series: |
VLT AutomationDrive FC 302 |
Power Designation: |
N355 — 355 KW At 400 V, High-overload Basis |
Supply Designation: |
T5 — Three Phase, 380–500 VAC |
Enclosure: |
IP54 |
RFI Designation: |
H2 — RFI Filter Class A2 (C3) |
Brake Chopper: |
X — No Brake Chopper |
Control Panel: |
G — Graphical LCP 102 |
PCB Coating: |
C — Coated PCB |
Mains Option: |
3 — Mains Disconnect And Fuse |
A Option: |
PROFINET MCA 120 |
B Option: |
BX — No B Option |
D Option: |
DX — No D Option |
Software Designation: |
SXXX — Standard Release Designation |
Complete Type Code: |
FC-302N355T5E54H2XGC3XXSXXXXALBXCXXXXDX |
Series: |
VLT AutomationDrive FC 302 |
Power Designation: |
N355 — 355 KW At 400 V, High-overload Basis |
Supply Designation: |
T5 — Three Phase, 380–500 VAC |
Enclosure: |
IP54 |
RFI Designation: |
H2 — RFI Filter Class A2 (C3) |
Brake Chopper: |
X — No Brake Chopper |
Control Panel: |
G — Graphical LCP 102 |
PCB Coating: |
C — Coated PCB |
Mains Option: |
3 — Mains Disconnect And Fuse |
A Option: |
PROFINET MCA 120 |
B Option: |
BX — No B Option |
D Option: |
DX — No D Option |
Software Designation: |
SXXX — Standard Release Designation |
Danfoss 136L9774, type FC-302N355T5E54H2XGC3XXSXXXXALBXCXXXXDX, is an FC 302 frequency converter in the 355 kW class. This AL-coded IP54 variant is a candidate for a PROFINET motor-control project requiring a protected drive enclosure. It helps the purchaser retain the communication choice while comparing the factory mains configuration and installation scope.
The drive controls motor speed to meet the process demand. Selection must account for motor current, operating voltage, acceleration, stopping and overload duty. A shared power rating does not make two configurations directly interchangeable.
Key Features and Application Focus
PROFINET MCA 120. IP54 PROFINET service is the main quotation focus. Assess use with the machine designer before specifying the drive for a particular load.
Supply and Quotation Information
Request a current quotation for 136L9774 with the complete type code, quantity and delivery destination. Pricing varies with the confirmed order scope. Availability and dispatch time are confirmed with the quotation. Ask the offer to state its validity, lead-time starting point and included accessories.
Compatibility and Selection Note
For an existing installation, send the original nameplate and parameter backup. Compare the supply, motor current, overload duty, enclosure, mains equipment, braking circuit and communication option. Any alternative needs a documented configuration review and commissioning plan. Matching 355 kW alone is insufficient.
Buying and Replacement FAQ
Q1. How do I request a price for 136L9774?
Send product code 136L9774, the full type code, quantity, destination and required date. Include the motor nameplate and application duty so the offer can be checked against the actual requirement.
Q2. Which network information should accompany an alternative request?
Provide the controller model, protocol requirement, device configuration and a backup of the existing drive settings. Keep AL visible on the purchase specification until the network review is complete.
Q3. What does the incoming-power scope include?
This type code specifies mains disconnect and fuse under code 3. Ask the quote to identify the supplied package and any additional upstream equipment.
Q4. What should I send for the communication review?
Retain AL on the quotation request. Specify PROFINET MCA 120, the controller model and the existing network project. Confirm the offered interface before accepting a different code.
Q5. How is delivery time confirmed?
Provide the required arrival date and destination. Ask the quotation to state availability, the dispatch date, the event that starts the lead time and the estimated transit time. Delivery commitments must be confirmed for the exact configuration and quantity.
Q6. Can another 355 kW drive replace this model?
Only after comparing the complete electrical, mechanical and control configuration. Check the original duty rating and motor current. Ask the offer to list every deviation and the required commissioning work before approving an alternative.
Tags: