Product Details
Brand Name: Danfoss
Model Number: 167G1855
Payment & Shipping Terms
Complete Type Code: |
FC-302N450T5E54H2XGC3XXSXXXXANBXCXXXXDX |
Series: |
VLT AutomationDrive FC 302 |
Power Designation: |
N450 — 450 KW Class; Confirm Overload Duty |
Supply Designation: |
T5 — Three Phase, 380–500 VAC |
Enclosure: |
IP54 |
RFI Designation: |
H2 |
Brake Chopper: |
X — No Brake Chopper |
Control Panel: |
G — Graphical Local Control Panel |
PCB Coating: |
C — Coated PCB |
Mains Option: |
3 — Mains Disconnect And Fuse |
A Option: |
EtherNet/IP MCA 121 |
B Option: |
BX — No B Option |
D Option: |
DX — No D Option |
Software Designation: |
SXXX — Standard Release Designation |
Complete Type Code: |
FC-302N450T5E54H2XGC3XXSXXXXANBXCXXXXDX |
Series: |
VLT AutomationDrive FC 302 |
Power Designation: |
N450 — 450 KW Class; Confirm Overload Duty |
Supply Designation: |
T5 — Three Phase, 380–500 VAC |
Enclosure: |
IP54 |
RFI Designation: |
H2 |
Brake Chopper: |
X — No Brake Chopper |
Control Panel: |
G — Graphical Local Control Panel |
PCB Coating: |
C — Coated PCB |
Mains Option: |
3 — Mains Disconnect And Fuse |
A Option: |
EtherNet/IP MCA 121 |
B Option: |
BX — No B Option |
D Option: |
DX — No D Option |
Software Designation: |
SXXX — Standard Release Designation |
Danfoss 167G1855, type FC-302N450T5E54H2XGC3XXSXXXXANBXCXXXXDX, is an FC 302 frequency converter in the 450 kW class. This AN-coded IP54 configuration is a candidate for EtherNet/IP-connected process machinery. A useful quotation must identify both the network option and the specified enclosure so that the buyer can compare the delivered package accurately.
The drive controls motor speed to meet the process demand. Selection must account for motor current, operating voltage, acceleration, stopping and overload duty. A shared power rating does not make two configurations directly interchangeable.
Key Features and Application Focus
EtherNet/IP MCA 121. IP54 EtherNet IP service is the main quotation focus. Assess use with the machine designer before specifying the drive for a particular load.
Supply and Quotation Information
Request a current quotation for 167G1855 with the complete type code, quantity and delivery destination. Pricing varies with the confirmed order scope. Estimated lead time is approximately 3 months, subject to confirmation at order placement. Ask the offer to state its validity, lead-time starting point and included accessories.
Compatibility and Selection Note
For an existing installation, send the original nameplate and parameter backup. Compare the supply, motor current, overload duty, enclosure, mains equipment, braking circuit and communication option. Any alternative needs a documented configuration review and commissioning plan. Matching 450 kW alone is insufficient.
Buying and Replacement FAQ
Q1. How do I request a price for 167G1855?
Send product code 167G1855, the full type code, quantity, destination and required date. Include the motor nameplate and application duty so the offer can be checked against the actual requirement.
Q2. Can 137G4706 be supplied because its enclosure is the same?
Do not approve it based on IP54 alone. The communication designation differs: AN here and AL on 137G4706. Confirm the required protocol before reviewing an alternative.
Q3. What does the incoming-power scope include?
This type code specifies mains disconnect and fuse under code 3. Ask the quote to identify the supplied package and any additional upstream equipment.
Q4. What should I send for the communication review?
Retain AN on the quotation request. Specify EtherNet/IP MCA 121, the controller model and the existing network project. Confirm the offered interface before accepting a different code.
Q5. When does the three-month lead time start?
Ask the quotation to define the starting event, such as order acceptance or payment confirmation. The estimated three months must also identify whether it covers dispatch or arrival. Confirm freight time separately.
Q6. Can another 450 kW drive replace this model?
Only after comparing the complete electrical, mechanical and control configuration. Check the original duty rating and motor current. Ask the offer to list every deviation and the required commissioning work before approving an alternative.
Tags: