Product Details
Place of Origin: Germany or China as original
Brand Name: B&R
Certification: CE UL cURus E360421 Servo and stepper motors - Component
Model Number: powerlink x20bc0083
Payment & Shipping Terms
Minimum Order Quantity: 1 piece
Price: USD 80 -500 piece as depend on booking price
Packaging Details: 50*15*2 CM
Delivery Time: 3-70 working days
Payment Terms: D/A, D/P, T/T, Western Union
Supply Ability: 5 sets 10 days
Brand: |
B&R |
Part Number: |
Powerlink X20bc0083 |
Part Number2: |
B&r X20bc0083 |
Part No.: |
R900931548 PVV4-1X/082RA15DMC |
Type:: |
X20bc0083 |
Bus Controller: |
POWERLINK (V1/V2) Controlled Node |
Status Indicators: |
Module Status, Bus Function |
Electrical Isolation: |
POWERLINK Isolated From Bus And I/O |
Line Length: |
Max. 100 M Between 2 Stations (segment Length) |
Transfer Rate: |
100 Mbit/s |
Physical Layer: |
100BASE-TX |
Brand: |
B&R |
Part Number: |
Powerlink X20bc0083 |
Part Number2: |
B&r X20bc0083 |
Part No.: |
R900931548 PVV4-1X/082RA15DMC |
Type:: |
X20bc0083 |
Bus Controller: |
POWERLINK (V1/V2) Controlled Node |
Status Indicators: |
Module Status, Bus Function |
Electrical Isolation: |
POWERLINK Isolated From Bus And I/O |
Line Length: |
Max. 100 M Between 2 Stations (segment Length) |
Transfer Rate: |
100 Mbit/s |
Physical Layer: |
100BASE-TX |
B&R Bus Controller X20BC0083:
DESCRIPTION:
* I/O configuration and firmware update via the fieldbus
*Power Link
* Integrated hub for economical wiring
The bus controller makes it possible to connect X2X Link I/O nodes to POWERLINK. It is also possible to operate the X2X Link cycle synchronously 1:1 or synchronous to POWERLINK using a prescaler.
POWERLINK is a standard protocol for Fast Ethernet equipped with hard real-time characteristics. The POWERLINK Standardization Group (EPSG) ensures that the standard remains open and is continually developed:: www.ethernet-powerlink.org.
System modules for bus controllers:
1. X20BB80 X20 bus base, for X20 base module (BC, HB, etc.) and X20 power supply module, X20 end cover plates (left and right) X20AC0SL1/X20AC0SR1 included
2. X20PS9400 X20 power supply module, for bus controller and internal I/O power supply X2X Link power supply
3. X20PS9402 X20 power supply module, for bus controller and internal I/O power supply, X2X Link supply, supply not galvanically isolated
B&R Bus controlers' List:
X20BC0043-10 |
X20BC0063 |
X20BC0073 |
X20BC0083 |
X20BC0087 |
X20BC0088 |
X20BC008T |
X20BC008U |
X20BC00E3 |
X20BC00G3 |
X20BC0143-10 |
Q: How Can I Get The Quotation?
A:We will submit the quotation in 24 hours if getting detailed informations during working days.In order to quote for you earlier, please provide us the following information together with your inquiry.
1) Your engineering request such as model power, control specifcaiton and model label;
2) If replace model, you can send us the exiting model label for faster confirm.
3) Any special demands or requirements, such as packing, labels,delivery,etc.
4) 24 Hours Hot Line:+8615011939995
Q: Before Shipment, How To Make Sure The Product's Quality?
A: We will supply you a video for the product detail , packing detail and so on, also will provide the high quality pictures to you forproduction approval.
Q: What Is Your Payment Terms?
A: Production Payment: 50% deposit in advance, 50% before sending out the final goods if do not have store. 100% deposit in advance for in Stock model.
Q:What Is The MOQ?
A: OEM Is Welcome, 1 Set Is Acceptable.
Q: What Should We Do If We Receive Defective Products?
A: If You Receive Defective Products, Please Send Us Photos Or Videos, We Will Solve The Problem As Soon As Possible. We Are Responsible For b&R Bust controlers Quality.
Q: How About The Technical Support ?
A: A Professional Engineer Team Will Be Here For You With 10 Years Experience.
Q: Which Payment Method And Express Can You Accept ?
A: T/T ; PayPal ; Trade Assurance ; Alipay if you have new solution. Welcome to call us.
Q: When Will My Parts Be Send Out ?
A: Order Time Will Be 3 Workdays, if no in Stock, Lead Time will be 1-4 Monthes.
Tags: