Product Details
Brand Name: Danfoss
Model Number: 135U2355
Payment & Shipping Terms
Complete Type Code: |
FC-302N450T5E20H2XGC7XXSXXXXAXBXCXXXXDX |
Series: |
VLT AutomationDrive FC 302 |
Power Designation: |
N450 — 450 KW Class; Confirm Overload Duty |
Supply Designation: |
T5 — Three Phase, 380–500 VAC |
Enclosure: |
IP20 |
RFI Designation: |
H2 |
Brake Chopper: |
X — No Brake Chopper |
Control Panel: |
G — Graphical Local Control Panel |
PCB Coating: |
C — Coated PCB |
Mains Option: |
7 — Confirm Factory Mains Equipment In Quotation |
A Option: |
No A-slot Option |
B Option: |
BX — No B Option |
D Option: |
DX — No D Option |
Software Designation: |
SXXX — Standard Release Designation |
Complete Type Code: |
FC-302N450T5E20H2XGC7XXSXXXXAXBXCXXXXDX |
Series: |
VLT AutomationDrive FC 302 |
Power Designation: |
N450 — 450 KW Class; Confirm Overload Duty |
Supply Designation: |
T5 — Three Phase, 380–500 VAC |
Enclosure: |
IP20 |
RFI Designation: |
H2 |
Brake Chopper: |
X — No Brake Chopper |
Control Panel: |
G — Graphical Local Control Panel |
PCB Coating: |
C — Coated PCB |
Mains Option: |
7 — Confirm Factory Mains Equipment In Quotation |
A Option: |
No A-slot Option |
B Option: |
BX — No B Option |
D Option: |
DX — No D Option |
Software Designation: |
SXXX — Standard Release Designation |
Danfoss 135U2355, type FC-302N450T5E20H2XGC7XXSXXXXAXBXCXXXXDX, is an FC 302 frequency converter in the 450 kW class. This chassis version separates the factory mains-option selection from an otherwise simple A-slot configuration. The key procurement issue is whether code 7 matches the protection arrangement specified by the panel designer.
The drive controls motor speed to meet the process demand. Selection must account for motor current, operating voltage, acceleration, stopping and overload duty. A shared power rating does not make two configurations directly interchangeable.
Key Features and Application Focus
No A-slot option. Cabinet mains configuration is the main quotation focus. Assess use with the machine designer before specifying the drive for a particular load.
Supply and Quotation Information
Request a current quotation for 135U2355 with the complete type code, quantity and delivery destination. Pricing varies with the confirmed order scope. Estimated lead time is approximately 3 months, subject to confirmation at order placement. Ask the offer to state its validity, lead-time starting point and included accessories.
Compatibility and Selection Note
For an existing installation, send the original nameplate and parameter backup. Compare the supply, motor current, overload duty, enclosure, mains equipment, braking circuit and communication option. Any alternative needs a documented configuration review and commissioning plan. Matching 450 kW alone is insufficient.
Buying and Replacement FAQ
Q1. How do I request a price for 135U2355?
Send product code 135U2355, the full type code, quantity, destination and required date. Include the motor nameplate and application duty so the offer can be checked against the actual requirement.
Q2. Is 135U0509 an identical alternative?
The two type codes differ at the mains-option position. This product has code 7, while 135U0509 has X. Obtain the factory option description and compare the power-circuit scope before approving a substitution.
Q3. What must I confirm about mains-option 7?
Keep code 7 on the request and ask for the exact factory mains-equipment description. Confirm what is inside the drive package and what must be supplied externally before approving the price.
Q4. What should I send for the communication review?
Retain AX on the quotation request. This configuration has no factory A-slot option. If a network connection is needed, specify the protocol and obtain a revised configuration review.
Q5. When does the three-month lead time start?
Ask the quotation to define the starting event, such as order acceptance or payment confirmation. The estimated three months must also identify whether it covers dispatch or arrival. Confirm freight time separately.
Q6. Can another 450 kW drive replace this model?
Only after comparing the complete electrical, mechanical and control configuration. Check the original duty rating and motor current. Ask the offer to list every deviation and the required commissioning work before approving an alternative.
Tags: