Product Details
Brand Name: Danfoss
Model Number: 136L8856
Payment & Shipping Terms
Complete Type Code: |
FC-302N450T5E20H2XGC7XXSXXXXA0BXCXXXXDX |
Series: |
VLT AutomationDrive FC 302 |
Power Designation: |
N450 — 450 KW Class; Confirm Overload Duty |
Supply Designation: |
T5 — Three Phase, 380–500 VAC |
Enclosure: |
IP20 |
RFI Designation: |
H2 |
Brake Chopper: |
X — No Brake Chopper |
Control Panel: |
G — Graphical Local Control Panel |
PCB Coating: |
C — Coated PCB |
Mains Option: |
7 — Confirm Factory Mains Equipment In Quotation |
A Option: |
PROFIBUS DP MCA 101 |
B Option: |
BX — No B Option |
D Option: |
DX — No D Option |
Software Designation: |
SXXX — Standard Release Designation |
Complete Type Code: |
FC-302N450T5E20H2XGC7XXSXXXXA0BXCXXXXDX |
Series: |
VLT AutomationDrive FC 302 |
Power Designation: |
N450 — 450 KW Class; Confirm Overload Duty |
Supply Designation: |
T5 — Three Phase, 380–500 VAC |
Enclosure: |
IP20 |
RFI Designation: |
H2 |
Brake Chopper: |
X — No Brake Chopper |
Control Panel: |
G — Graphical Local Control Panel |
PCB Coating: |
C — Coated PCB |
Mains Option: |
7 — Confirm Factory Mains Equipment In Quotation |
A Option: |
PROFIBUS DP MCA 101 |
B Option: |
BX — No B Option |
D Option: |
DX — No D Option |
Software Designation: |
SXXX — Standard Release Designation |
Danfoss 136L8856, type FC-302N450T5E20H2XGC7XXSXXXXA0BXCXXXXDX, is an FC 302 frequency converter in the 450 kW class. This configuration combines the PROFIBUS A0 designation with factory mains-option code 7. It is useful for a request that must preserve both the control network and the specified incoming-power arrangement.
The drive controls motor speed to meet the process demand. Selection must account for motor current, operating voltage, acceleration, stopping and overload duty. A shared power rating does not make two configurations directly interchangeable.
Key Features and Application Focus
PROFIBUS DP MCA 101. PROFIBUS with mains option is the main quotation focus. Assess use with the machine designer before specifying the drive for a particular load.
Supply and Quotation Information
Request a current quotation for 136L8856 with the complete type code, quantity and delivery destination. Pricing varies with the confirmed order scope. Estimated lead time is approximately 3 months, subject to confirmation at order placement. Ask the offer to state its validity, lead-time starting point and included accessories.
Compatibility and Selection Note
For an existing installation, send the original nameplate and parameter backup. Compare the supply, motor current, overload duty, enclosure, mains equipment, braking circuit and communication option. Any alternative needs a documented configuration review and commissioning plan. Matching 450 kW alone is insufficient.
Buying and Replacement FAQ
Q1. How do I request a price for 136L8856?
Send product code 136L8856, the full type code, quantity, destination and required date. Include the motor nameplate and application duty so the offer can be checked against the actual requirement.
Q2. Why quote this separately from 132X3056?
The network designation is the same, but the mains-option code differs. Ask the offer to state the exact factory mains equipment so that the two quotations can be compared on an equal scope.
Q3. What must I confirm about mains-option 7?
Keep code 7 on the request and ask for the exact factory mains-equipment description. Confirm what is inside the drive package and what must be supplied externally before approving the price.
Q4. What should I send for the communication review?
Retain A0 on the quotation request. Specify PROFIBUS DP MCA 101, the controller model and the existing network project. Confirm the offered interface before accepting a different code.
Q5. When does the three-month lead time start?
Ask the quotation to define the starting event, such as order acceptance or payment confirmation. The estimated three months must also identify whether it covers dispatch or arrival. Confirm freight time separately.
Q6. Can another 450 kW drive replace this model?
Only after comparing the complete electrical, mechanical and control configuration. Check the original duty rating and motor current. Ask the offer to list every deviation and the required commissioning work before approving an alternative.
Tags: